120,000 L Diesel Fuel Vessels – North Coast Cranes

Coffs Eco Blast was engaged by North Coast Cranes to undertake on-site surface preparation and protective coating works to four large diesel fuel vessels, each with a capacity of approximately 120,000 litres.

Mobile Site Works

The size of the vessels required the blasting and coating work to be completed on location before the tanks were transported to their final destinations.

Scope of Works

The external steel surfaces were abrasive blasted and prepared for coating. Following preparation, an epoxy primer was applied and the system was completed with a polyurethane topcoat.

This project demonstrates our ability to mobilise for large industrial assets that cannot practically be transported to the workshop and to carry the work through from surface preparation to protective coating application.

Get a Free Quote

Recent Projects